Kingston Technology Hub: Project Information

This page brings together publicly available information, project documents, meeting materials, and research related to the proposed Kingston Technology Hub. Information will be updated as additional documents and developments become available.

Example of a large-scale data center campus. Image is illustrative and does not depict the proposed Kingston Technology Center.

Kingston Technology Center: Project Information

This page provides a clear overview of the Kingston Technology Hub proposal, including its location, development plans, infrastructure needs, public-review process, and documents connected to the project. Additional records and verified updates will be added as they become available.

Current Proposal at a Glance

Project: Kingston Technology Center

Status: Proposed; currently moving through Georgia’s Development Regional Impact process as DRI #4835. The DRI review itself does not approve construction.

Location: Off Georgia State Route 293 near Law Road and Wellons Road in the area of Bartow County/

Site: Approximately 559 acres.

Proposed building: Approximately 350,000 square feet.

Developer listed in the DRI filing: Thor Acquisition WC LLC.

Local action requested: Rezoning

Estimated investment: Approximately $1 billion, according to project and public-record materials.

Water & Power

Large data center projects can require substantial electrical capacity and may also use water for cooling and other facility operations. This section will track what is documented about the Kingston Technology Center’s projected water and power needs, along with questions that remain unanswered.

Water Use

The developer’s project website says the facility is expected to request about 100,00 gallons of water per day but use less than 50,000 gallons of water per day. The site describes the proposed cooling system as a closed-loop, meaning water would be recirculated rather than continually discarded. These figures are developer estimates and should be updated if utility agreements or engineering documents provide more precise information.

Power Demand

Public reporting on the project describes a planned electrical load of approximately 150 megawatts. The DRI-related reporting indicates the project would require major electrical infrastructure, including an on-site substation and distribution system. The 150 MW figure describes power demand, not daily energy consumption.

Illustrative image of electrical transmission infrastructure. It does not depict infrastructure specifically proposed for the Kingston Technology Center.

Environment & Wildlife

The area affected in Bartow County includes woods, streams, fields, and wildlife habitat are an important part of the community’s rural character. Large-scale development could affect these natural areas through habitat loss, stormwater runoff, increased noise and lighting, and changes to nearby waterways. These potential impacts deserve careful review before major changes are made to the landscape.

Traffic & Roads

The proposed development could bring additional construction and service traffic to roads that currently serve a largely rural community. Residents are concerned about traffic volume, truck traffic, road safety, noise, and whether existing roads and intersections can accommodate a project of this scale.

Property & Community

Residents are also concerned about how a large data center development could affect nearby homes, property values, quality of life, noise levels, views, and the rural character of this area of Bartow County. This section will bring together research, local concerns, and information about potential community impacts.